Update, 9/7: The expansion joint has been repaired and the lane was reopened this morning.
Milling and paving to level out the bridge transitions is anticipated to take place in mid-September, weather permitting.
Original Post, 9/6: #EagleRiverLoop left northbound lane is closed at #BriggsBridge until further notice to repair an expansion joint.
Original source can be found here.